The disadvantages of traditional urban rail electrical management

Poor safetyLeakage, short circuit, lightning strikes (outdoor) often occur; Without real-time supervision, the faulty equipment needs to be manually inspected.

Low efficiency:Power off manual execution, low efficiency, ineffective power consumption for a long time; Low efficiency and high cost, deep hidden dangers can not rely on manual detection; Rely on manual inspection, blind area omission or implementation rely on self-consciousness; Passive service, poor passenger or internal experience, high complaint rate.

Stiff:Lack of flexible and effective energy saving control means; Excessive lighting and insufficient lighting are difficult to coordinate, the air conditioner is too cold and overheated, and the elevator is open without anyone; In bad weather, the original plan is still implemented, affecting the urban rail management.

Extensive:Management is complicated, there are many things to do, and it is impossible to satisfy all parties; Collection and monitoring of the area; Can not be accurate and intelligent management; Can not achieve real-time fault tracking and analysis.

High cost:Lighting and other electrical equipment control is not accurate, high electricity costs; The aging situation of equipment is unpredictable, the procurement is suddenly high, and the inventory is accumulated.

Manton smart power solutions

 

(一)Overview of the Manton scheme

Truly solve the intelligent power consumption of urban rail, to achieve real-time, effective and accurate data acquisition of end power consumption, to achieve accurate switch control of urban rail electrical equipment, flexible and effective energy-saving control, to achieve intelligent environment dynamic regulation, automatic adjustment of temperature and humidity according to changes in seasons, temperature and humidity, passenger flow, etc., to provide passengers with a comfortable environment.

High power management efficiency, no dead corners, fine, platform and APP can directly see each switch of a variety of electricity data, current, voltage, leakage, ignition, overload and so on.

The scheme is simple, the difficulty of construction and maintenance is small, and the cost is controllable.

(二)Manton scheme design

6374477188642037508838597.png

(三)Manton program highlights

 

The scheme is simple, direct and effective:Add a single device after the meter, or directly replace the original air switch; The daily, weekly and monthly inspection is automatically timed and completed at the second level to form a standard report.

The construction difficulty is small, and the end user is easy to accept:Replace the original air switch or add a single device in series, with low space requirements.

Easy to maintain and intuitive to use:Every switch is visible using the APP, improving the experience of maintenance personnel and end users.

Enhanced safety: Replace the original air switch to improve the overall safety of electricity consumption from a solution point of view.

Thoroughly solve safety problems and save electricity:Fine to each switch can be monitored and controlled (increase current and voltage, leakage, temperature, ignition, power, etc.), 12,000 times per second data acquisition, high accuracy.

×